CH 03 · Launch timeline

Every stopto March.

Where the build is today, what comes next and when your batch ships. We update this page on the first of every month.

● 03 / 05
Updated 28 Sep 2026
T-minus · Batch 1
21 Mar 2027 · 14:00 GMT
03 / 09 · 15 Sep 2026Done
Launch list opens

The list opened at 09:00 on 15 September and passed 1,000 people in eleven days. Your number is fixed when you join, and every friend who joins with your link moves you up 50 places.

Launch board

Batch 1 shipson the equinox.

The first 1,000 Skysets leave Bristol on 21 March 2027. The board runs to the second, and so do we.

T-minus · Batch 121 Mar 2027 · 14:00 GMT
117733
Days
2222
Hours
1199
Minutes
5566
Seconds

What happens at T-0

  1. 01 · 14:00 GMT

    Batch 1 opens

    Orders open to the list in number order, starting at #1. You get an email with your own checkout link.

  2. 02 · Next 72 hours

    Confirm your set

    You have 72 hours to confirm and pay the $249 founder price. Unclaimed sets pass to the next number.

  3. 03 · Then

    Dispatch starts

    Sets leave Bristol in number order, with tracking by email. Free shipping to the UK, EU, US and Canada.

Dispatches from
the studio.

Short updates · newest first

08

08

Tooling

First steel for the shell moulds

Two moulds, front and back, cut in P20 steel. Samples in six weeks.

07

07

Launch

The launch list is open

1,000 sets in Batch 1. No deposit. Every friend moves you up 50 places.

06

06

Hardware

Radio board revision C

Better reception on 137 MHz: weather pictures now come through from 15 degrees up.

05

05

Hardware

Battery life, measured

18 hours with the tube on for four hours a night. A full charge takes two hours on USB-C.

04

04

Software

Aurora alerts added

The set now watches the Kp index and rings when aurora may be visible from your latitude.

03

03

Software

Prototype 04 rings on time

Chime timing fixed: within 3 seconds of the predicted rise on 40 passes in a row.

02

02

Beta

Beta testers wanted

40 sets go to amateur astronomers in December. Applications open to the launch list.

01

01

Build log

Prototype 01 in cardboard

An oscilloscope tube, a radio board and a cardboard shell. It showed one satellite, badly.

Launch list

Be there
at T-0.

Batch 1 ships on 21 March 2027. Join today and you are #1,284; every friend who joins with your link moves you up 50 places.

No deposit · no spam · leave the list any time

KELVANE
51.45N 2.59W
Est. 2025 · Bristol
Launch list · open

1,283 on the listBatch 1 ships 21 March 2027

No deposit. You pay when your batch ships.

Transmitting from 12 Wharf Lane, Bristol · 51.45N 2.59W
PrivacyTerms© 2026 Kelvane Ltd

Create a free website with Framer, the website builder loved by startups, designers and agencies.